Kerr Street Water Pipeline System
CPB Contractors engaged Eifers to supply Ecofil (at 2mpa with no more than 3% shrinkage) for a redundant water pipeline system that was 1200mm in diameter and 375m long from Kerr St to Alexandria Pre in North Fitzroy. The fall grade over the entire pipe was around 0.7%.Grouting of the 360m @ 1200mm M41 redundant line water from Merri Creek to MCG water main renewal using Ecofil. Works were completed from one end and pumped down the line over two days.