Transdev Doncaster Bus Depot

Remove and replace concrete slabs within the only entrance for buses at Transdev Bus depot. The work required saw cutting, slurry removal, lifting and disposal of the existing concrete pavement slabs, and pouring of High-strength Rapid Set Concrete with our volumetric machines. All works were to be completed within a confined area being the operational entrance to the bus depot.

Previous
Previous

Meadowlink Shared User Path

Next
Next

Sherbourne Public School Sports Field Upgrade