Antoun, in partnership with Eifers, has completed over 22 aircraft runway slabs at Melbourne Airport as part of ongoing infrastructure rectification works.

Read More
Samuel Koh Samuel Koh

Transdev Doncaster Bus Depot

Remove and replace concrete slabs within the only entrance for buses at Transdev Bus depot. The work required saw cutting, slurry removal, lifting and disposal of the existing concrete pavement slabs.

Read More
Samuel Koh Samuel Koh

Sierra Slab Replacements Melbourne Airport

Eifers removed and replaced concrete slabs on behalf of Antoun within the sierra taxiway all within 4 hours. The work required saw cutting, slurry removal, lifting and disposal of the existing concrete pavement slabs, and pouring of High-strength Rapid Set Concrete with our Volumetric trucks.

Read More
Samuel Koh Samuel Koh

Melbourne Airport Specialised Runway Repairs

Eifers was contracted to fix and prolong the life of 141 concrete runway slabs (7.6m x 7.6m) damaged by spalling, cracking and shaling that had begun to cause foreign object damage (FOD) to aircraft and other runway vehicles.

Read More
Samuel Koh Samuel Koh

Keilor Park Drive

Eifers completed time critical works on behalf of Vic Roads for Keilor Park Drive. The scope of works for this project included site Management, saw cutting, demolition and dowel drilling.