Kerr Street Water Pipeline System
Kerr Street Water Pipeline System
PROJECT OVERVIEW:
Eifers Civil were engages by CPB contractors to supply EcoFil50 2mpa (no more than 3% shrinkage) to a redundant water pipeline system that was 1200mm in diameter and 375m long from Kerr St to Alexandria, Nth Fitzroy.
The fall grade over the entire pipe was around 0.7% and with the use of pump feeder lines from end to end of the pipeline the grout was able to be bumped from over 375m away from the project site.