Dandenong Gate Gas Plant

Comdain Gas whom is the principal contractor to APA Group engaged Eifers to complete major civil works in the upgrade to the Dandenong City Gate (DCG) Gas Plant. The plant is the main supply of gas for Victoria and due for a major upgrade. The upgrade required hydro- excavation (NDE) due to the high risk of mechanically excavating close the gas mains and regulators it also required on-site high-level gas detection equipment. The hydro-excavation in the plant was quite extensive with conduit run also having to be NDE to depth along the whole trench.

Once potholing to depths was done, we were able to start mechanical excavating for the Gas Regulator Skid foundations & slab, Air Compressor slab, Cable Tray Concrete Plinths and drilling of the pier holes for the new Control Hut. These structures had detailed specifications for formwork and steelwork involved in the construction.

Eifers was also tasked with the excavating a 750mm wide and up to 1.2m deep trench for the laying of multiple conduits which included a major 90mm airline from the Liquid Natural Gas plant to the air compressor inside the DCG and the backfilling with packing sand and compacting the re-instated ground that required compaction testing. This task was made a lot more difficult as it ran alongside a major high-pressure gas pipeline.

Eifers safely completed the contracted works on time and budget with both the client APA Group and the principal contractor Comdain Gas, extremely impressed with our workmanship and attention to safety.







Previous
Previous

JUHI Fuel Riser Removal

Next
Next

HMAS Canberra Ballast Project