Our Projects
South Centre Road, Melbourne Airport
Eifers recently completed critical infrastructure construction works to South Centre Road Tullamarine on behalf of Melbourne Airport.
Melbourne Airport Enviropacific Water Treatment Facility Stage 2
On behalf of Enviropacific and Melbourne Airport, Eifers completed earthworks to build 2km of the road to service Melbourne Airport’s temporary PFAS Soil Storage and stockpile area and associated Water Treatment Plant.
MAPMP Asphalt Maintenance
Eifers in time-critical fashion, completed urgent asphalt maintenance works to Melbourne Airport's busy taxiways throughout 2019 and 2020.
Melbourne Airport Enviropacific Water Treatment Facility Stage 1
Eifers, on behalf of Enviropacific recently completed Stage 1 of the Soil Storage Facility at Melbourne Airport.
Melbourne Avalon Airport Rapid Set Slab Replacement
Antoun, in partnership with Eifers™ recently completed two runway slab replacements at Avalon Airport - 70 years after its original pour!
MAPMP Rapid Set Melbourne Airport
Antoun, in partnership with Eifers, has completed over 22 aircraft runway slabs at Melbourne Airport as part of ongoing infrastructure rectification works.
Sierra Slab Replacements Melbourne Airport
Eifers removed and replaced concrete slabs on behalf of Antoun within the sierra taxiway all within 4 hours. The work required saw cutting, slurry removal, lifting and disposal of the existing concrete pavement slabs, and pouring of High-strength Rapid Set Concrete with our Volumetric trucks.
Melbourne Airport Specialised Runway Repairs
Eifers was contracted to fix and prolong the life of 141 concrete runway slabs (7.6m x 7.6m) damaged by spalling, cracking and shaling that had begun to cause foreign object damage (FOD) to aircraft and other runway vehicles.
PFAS Removal for Exxon Mobil
On behalf of Exxon Mobil, Eifers completed the construction of storage cells for the safe removal and disposal of PFAS contaminated soil.