Our Projects
GBAS RSM Antena Installation
Eifers assisted in the installation of 5 airside antennas and a containment cell (including several concrete placements) at Melbourne Airport’s SmartPath (GBAS).
JUHI Fuel Riser Removal
Eifers was contracted to remove an unused fuel cell pipeline riser at Delta D9, Melbourne Airport in 2016. The work required saw cutting, slurry removal, lifting and disposal of the existing concrete pavement slabs, all within the operational airfield.
Dandenong Gate Gas Plant
Comdain Gas whom is the principal contractor to APA Group engaged Eifers to complete major civil works in the upgrade to the Dandenong City Gate (DCG) Gas Plant. The plant is the main supply of gas for Victoria and due for a major upgrade.
HMAS Canberra Ballast Project
Eifers was engaged for the mobile batching of 40T of ballast to be loaded into HMAS Canberra, and it’s sister ship, HMAS Adelaide.
Thomastown Railway Station Repair Works
Repair of the bus station at the Thomastown Train Station within a set time-frame.
Melbourne Airport Forward Command Post
Eifers was contracted by Melbourne Airport to aid in relocating the Forward Command Post (FCP) to the northern end of the airfield.
Safety Officer Carpark Melbourne Airport
Due to constant traffic and weather damage, we were contracted to repair the WSO carpark at Melbourne Airport, amending the crushed rock pavement and increasing the number of parking spaces twofold.
Sydney Road Emergency Pavement Repairs
Sydney Road Coburg is one of Melbourne’s busiest arterial roads leading into the city. To minimise traffic congestion and provide repairs to the damaged paving, we began with the saw cutting and demolition of existing impaired pavement and subgrade.
Northern School of Autism Carpark Re-Development
Eifers was tasked with redeveloping the existing carpark area at the front reception of the Northern School of Autism, introducing a new drive-through and drop off area including a pedestrian crossing.