Our Projects

Samuel Koh Samuel Koh

MAPMP Rapid Set Melbourne Airport

Antoun, in partnership with Eifers, has completed over 22 aircraft runway slabs at Melbourne Airport as part of ongoing infrastructure rectification works.

Read More
Samuel Koh Samuel Koh

Sale RAAF Base

Eifers carried out the removal of over 10,000sq of 400mm thick aircraft pavement at East Sale RAAF Base. Works included saw cutting, demolition and material trucking.

Read More
Samuel Koh Samuel Koh

Meadowlink Shared User Path

Eifers Civil was engaged by Hume City Council to transform a decommissioned rail siding in Broadmeadows into a vibrant, accessible open space corridor.

Read More
Samuel Koh Samuel Koh

Transdev Doncaster Bus Depot

Remove and replace concrete slabs within the only entrance for buses at Transdev Bus depot. The work required saw cutting, slurry removal, lifting and disposal of the existing concrete pavement slabs.

Read More
Samuel Koh Samuel Koh

Sierra Slab Replacements Melbourne Airport

Eifers removed and replaced concrete slabs on behalf of Antoun within the sierra taxiway all within 4 hours. The work required saw cutting, slurry removal, lifting and disposal of the existing concrete pavement slabs, and pouring of High-strength Rapid Set Concrete with our Volumetric trucks.

Read More
Samuel Koh Samuel Koh

Melbourne Airport Specialised Runway Repairs

Eifers was contracted to fix and prolong the life of 141 concrete runway slabs (7.6m x 7.6m) damaged by spalling, cracking and shaling that had begun to cause foreign object damage (FOD) to aircraft and other runway vehicles.

Read More
Samuel Koh Samuel Koh

Keilor Park Drive

Eifers completed time critical works on behalf of Vic Roads for Keilor Park Drive. The scope of works for this project included site Management, saw cutting, demolition and dowel drilling.

Read More
Samuel Koh Samuel Koh

Kerr Street Water Pipeline System

CPB Contractors engaged Eifers to supply cellular concrete (at 2mpa with no more than 3% shrinkage) for a redundant water pipeline system that was 1200mm in diameter and 375m long from Keer St to Alexandria Pre in North Fitzroy.

Read More
Samuel Koh Samuel Koh

PFAS Removal for Exxon Mobil

On behalf of Exxon Mobil, Eifers completed the construction of storage cells for the safe removal and disposal of PFAS contaminated soil.

Read More
Samuel Koh Samuel Koh

Lilydale Airport Runway

Due to taxiway flooding issues, Eifers was contracted to establish a new runway for Lilydale Airport by Waterpave (a local supplier of pervious concrete) to supply and pour 2250m2 concrete within a two-week time frame.

Read More
Samuel Koh Samuel Koh

Mernda Rail Extension Project

Eifers have been fortunate enough to be a part of the Mernda Rail Extension Project, undertaking works to widen Bridge Inn road.

Read More
Samuel Koh Samuel Koh

Westmeadows Primary School

Eifers was commissioned by the governing council at Westmeadows Primary School for the construction of a new multi-purpose sports field and associated infrastructure.

Read More